| report [2025/06/16 04:50] – [7.6 Prototype] team1 | report [2025/06/22 18:33] (current) – [3.11 Sprint Outcomes] team1 | ||
|---|---|---|---|
| Line 324: | Line 324: | ||
| ^ Task ^ Proposed date ^ Effective date^ | ^ Task ^ Proposed date ^ Effective date^ | ||
| |Choose the project proposal| 2025-03-01 | |Choose the project proposal| 2025-03-01 | ||
| - | |System Diagrams & Structural Drafts| 2025-03-12 | + | |System Diagrams & Structural Drafts| 2025-03-12 |
| |Project Backlog, Global Sprint Plan, Initial Sprint Plan and Release Gantt Chart| 2025-03-15 | |Project Backlog, Global Sprint Plan, Initial Sprint Plan and Release Gantt Chart| 2025-03-15 | ||
| |List of Components and Materials| 2025-03-19 | |List of Components and Materials| 2025-03-19 | ||
| Line 330: | Line 330: | ||
| |Interim Report | 2025-04-06 |2025-04-06| | |Interim Report | 2025-04-06 |2025-04-06| | ||
| |Interim Presentation| 2025-04-10 |2025-04-10| | |Interim Presentation| 2025-04-10 |2025-04-10| | ||
| - | |3D model video| 2025-04-15 |2025-04-15 and the final version at | | + | |3D model video| 2025-04-15 |2025-04-15 and the final version at 2025-05-28 |
| |Final List of Materials| 2025-04-29 |2025-04-29| | |Final List of Materials| 2025-04-29 |2025-04-29| | ||
| |Refined Interim Report| 2025-05-02 |2025-05-02| | |Refined Interim Report| 2025-05-02 |2025-05-02| | ||
| |Packaging Solution| 2025-05-14 |2025-05-14| | |Packaging Solution| 2025-05-14 |2025-05-14| | ||
| |Functional Tests| 2025-05-28 |2025-05-28| | |Functional Tests| 2025-05-28 |2025-05-28| | ||
| - | |Final Report, Presentation, | + | |Final Report, Presentation, |
| - | |Final Presentation| 2025-06-18 || | + | |Final Presentation| 2025-06-18 |2025-06-18| |
| - | |Refined Final Report| 2025-06-25 || | + | |Refined Final Report| 2025-06-25 |2025-06-22| |
| - | |Prototype and User Manual| 2025-04-10 || | + | |
| </ | </ | ||
| </ | </ | ||
| Line 725: | Line 724: | ||
| | O | Functional Tests | Done | | | O | Functional Tests | Done | | ||
| | P | Final Report | | P | Final Report | ||
| - | | Q | Presentation | + | | Q | Presentation |
| - | | R | Video | Ongoing | + | | R | Video | Done |
| | S | Paper | Done | | | S | Paper | Done | | ||
| | T | Poster | | T | Poster | ||
| | U | Manual | | U | Manual | ||
| - | | V | Upload | + | | V | Upload |
| | W | Prototype | | W | Prototype | ||
| | X | Change the interim report | | X | Change the interim report | ||
| Line 792: | Line 791: | ||
| | 13 | P | 4 | All | All | | | 13 | P | 4 | All | All | | ||
| | 13 | Q | 4 | All | All | | | 13 | Q | 4 | All | All | | ||
| + | | 14 | R | 3 | Pierre | ||
| + | | 14 | P | 4 | All | All | | ||
| + | | 14 | Q | 4 | All | All | | ||
| + | | 14 | V | 4 | All | All | | ||
| </ | </ | ||
| </ | </ | ||
| Line 849: | Line 852: | ||
| | 13 | P | 4 | All | All |Ongoing| | | 13 | P | 4 | All | All |Ongoing| | ||
| | 13 | Q | 4 | All | All |Ongoing| | | 13 | Q | 4 | All | All |Ongoing| | ||
| + | | 14 | R | 3 | Pierre | ||
| + | | 14 | P | 4 | All | All |Done| | ||
| + | | 14 | Q | 4 | All | All |Done| | ||
| + | | 14 | V | 4 | All | All |Done| | ||
| </ | </ | ||
| </ | </ | ||
| Line 1151: | Line 1158: | ||
| </ | </ | ||
| In this sprint, the planned work was developed during the sprint. However, the team added a task on day three related to load and stress simulations. All this information is present in image {{ref> | In this sprint, the planned work was developed during the sprint. However, the team added a task on day three related to load and stress simulations. All this information is present in image {{ref> | ||
| + | |||
| + | |||
| + | <WRAP round box> | ||
| + | <table table-sprint-14> | ||
| + | < | ||
| + | <WRAP center> | ||
| + | ^ Product Backlog Item ^ Assignee | ||
| + | |Minute and week report |Tomás|0.5|Done| | ||
| + | |Refined list of materials|Pierre|5|Done| | ||
| + | |Finish the video|Pierre|8|Done| | ||
| + | |Finish the presentation|All|6|Done| | ||
| + | |Explanation of power budget and electrical diagram|Pierre|16|Done| | ||
| + | |Chapter 4|Aaro|6|Done| | ||
| + | |Chapter 7|Pierre and Waad|8|Done| | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | < | ||
| + | <figure figure-sprint-14> | ||
| + | {{ : | ||
| + | < | ||
| + | </ | ||
| + | </ | ||
| + | In this sprint, the planned work was developed during the sprint. All this information is present in image {{ref> | ||
| ==== - Sprint Evaluations ==== | ==== - Sprint Evaluations ==== | ||
| Line 2366: | Line 2398: | ||
| In the prototype, due to the decision to prepare it with lightweight materials and scaled, as well as due to lack of access to the mechanical components at the moment of assembling it, the prototype does not include automatic adjustments of the originally ergonomic benches and table. | In the prototype, due to the decision to prepare it with lightweight materials and scaled, as well as due to lack of access to the mechanical components at the moment of assembling it, the prototype does not include automatic adjustments of the originally ergonomic benches and table. | ||
| - | The initial idea to counter this obstable | + | The initial idea to counter this obstacle |
| Therefore, the prototype in the field of adjustability sets on the illustration of the core idea of how the product should work, although the adjustments still have to be done manually. | Therefore, the prototype in the field of adjustability sets on the illustration of the core idea of how the product should work, although the adjustments still have to be done manually. | ||
| Line 2473: | Line 2505: | ||
| < | < | ||
| <WRAP center> | <WRAP center> | ||
| - | ^ Use case ^ Description | + | ^ Use case ^ Result |
| | UC1 - Automatic Lighting | Pass | | | UC1 - Automatic Lighting | Pass | | ||
| | UC2 - Adjustable work surface height | Pass | | | UC2 - Adjustable work surface height | Pass | | ||