| report [2025/06/22 18:11] – [3.2 Time] team1 | report [2025/06/22 18:33] (current) – [3.11 Sprint Outcomes] team1 | ||
|---|---|---|---|
| Line 724: | Line 724: | ||
| | O | Functional Tests | Done | | | O | Functional Tests | Done | | ||
| | P | Final Report | | P | Final Report | ||
| - | | Q | Presentation | + | | Q | Presentation |
| - | | R | Video | Ongoing | + | | R | Video | Done |
| | S | Paper | Done | | | S | Paper | Done | | ||
| | T | Poster | | T | Poster | ||
| | U | Manual | | U | Manual | ||
| - | | V | Upload | + | | V | Upload |
| | W | Prototype | | W | Prototype | ||
| | X | Change the interim report | | X | Change the interim report | ||
| Line 791: | Line 791: | ||
| | 13 | P | 4 | All | All | | | 13 | P | 4 | All | All | | ||
| | 13 | Q | 4 | All | All | | | 13 | Q | 4 | All | All | | ||
| + | | 14 | R | 3 | Pierre | ||
| + | | 14 | P | 4 | All | All | | ||
| + | | 14 | Q | 4 | All | All | | ||
| + | | 14 | V | 4 | All | All | | ||
| </ | </ | ||
| </ | </ | ||
| Line 848: | Line 852: | ||
| | 13 | P | 4 | All | All |Ongoing| | | 13 | P | 4 | All | All |Ongoing| | ||
| | 13 | Q | 4 | All | All |Ongoing| | | 13 | Q | 4 | All | All |Ongoing| | ||
| + | | 14 | R | 3 | Pierre | ||
| + | | 14 | P | 4 | All | All |Done| | ||
| + | | 14 | Q | 4 | All | All |Done| | ||
| + | | 14 | V | 4 | All | All |Done| | ||
| </ | </ | ||
| </ | </ | ||
| Line 1150: | Line 1158: | ||
| </ | </ | ||
| In this sprint, the planned work was developed during the sprint. However, the team added a task on day three related to load and stress simulations. All this information is present in image {{ref> | In this sprint, the planned work was developed during the sprint. However, the team added a task on day three related to load and stress simulations. All this information is present in image {{ref> | ||
| + | |||
| + | |||
| + | <WRAP round box> | ||
| + | <table table-sprint-14> | ||
| + | < | ||
| + | <WRAP center> | ||
| + | ^ Product Backlog Item ^ Assignee | ||
| + | |Minute and week report |Tomás|0.5|Done| | ||
| + | |Refined list of materials|Pierre|5|Done| | ||
| + | |Finish the video|Pierre|8|Done| | ||
| + | |Finish the presentation|All|6|Done| | ||
| + | |Explanation of power budget and electrical diagram|Pierre|16|Done| | ||
| + | |Chapter 4|Aaro|6|Done| | ||
| + | |Chapter 7|Pierre and Waad|8|Done| | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | < | ||
| + | <figure figure-sprint-14> | ||
| + | {{ : | ||
| + | < | ||
| + | </ | ||
| + | </ | ||
| + | In this sprint, the planned work was developed during the sprint. All this information is present in image {{ref> | ||