report [2025/06/22 18:11] – [3.2 Time] team1report [2025/06/22 18:33] (current) – [3.11 Sprint Outcomes] team1
Line 724: Line 724:
 | O         | Functional Tests    | Done      |   | O         | Functional Tests    | Done      |  
 | P         | Final Report    | Done      |   | P         | Final Report    | Done      |  
-| Q         | Presentation    | Ongoing         +| Q         | Presentation    | Done         
-| R         | Video    | Ongoing      |  +| R         | Video    | Done      |  
 | S         | Paper    | Done      |   | S         | Paper    | Done      |  
 | T         | Poster    | Done      |   | T         | Poster    | Done      |  
 | U         | Manual    | Done      |   | U         | Manual    | Done      |  
-| V         | Upload    | To do      |  +| V         | Upload    | Done      |  
 | W         | Prototype    | Done      |   | W         | Prototype    | Done      |  
 | X         | Change the interim report    | Done       | | X         | Change the interim report    | Done       |
Line 791: Line 791:
 | 13        | P     | 4             | All      | All | | 13        | P     | 4             | All      | All |
 | 13        | Q     | 4             | All      | All | | 13        | Q     | 4             | All      | All |
 +| 14        | R     | 3             | Pierre      | Pierre |
 +| 14        | P     | 4             | All      | All |
 +| 14        | Q     | 4             | All      | All |
 +| 14        | V     | 4             | All      | All |
 </WRAP> </WRAP>
 </table> </table>
Line 848: Line 852:
 | 13        | P     | 4             | All      | All |Ongoing| | 13        | P     | 4             | All      | All |Ongoing|
 | 13        | Q     | 4             | All      | All |Ongoing| | 13        | Q     | 4             | All      | All |Ongoing|
 +| 14        | R     | 3             | Pierre      | Pierre |Done|
 +| 14        | P     | 4             | All      | All |Done|
 +| 14        | Q     | 4             | All      | All |Done|
 +| 14        | V     | 4             | All      | All |Done|
 </WRAP> </WRAP>
 </table> </table>
Line 1150: Line 1158:
 </WRAP> </WRAP>
 In this sprint, the planned work was developed during the sprint. However, the team added a task on day three related to load and stress simulations. All this information is present in image {{ref>figure-sprint-13}}. In this sprint, the planned work was developed during the sprint. However, the team added a task on day three related to load and stress simulations. All this information is present in image {{ref>figure-sprint-13}}.
 +
 +
 +<WRAP round box>
 +<table table-sprint-14>
 +<caption>Sprint 14 - 12/05 to 18/06(velocity planned: 1w 1d 1h 20m and real velocity: 1w 6h 20m)</caption>
 +<WRAP center>
 +^ Product Backlog Item    ^ Assignee          ^ Planned Effort [h]     ^ Status ^ 
 +|Minute and week report |Tomás|0.5|Done|
 +|Refined list of materials|Pierre|5|Done|
 +|Finish the video|Pierre|8|Done|
 +|Finish the presentation|All|6|Done|
 +|Explanation of power budget and electrical diagram|Pierre|16|Done|
 +|Chapter 4|Aaro|6|Done|
 +|Chapter 7|Pierre and Waad|8|Done|
 +</WRAP>
 +</table>
 +</WRAP>
 +
 +<WRAP>
 +<figure figure-sprint-14>
 +{{ :burndown_chart_-_sprint_14.png?600 |}}
 +<caption>Burndown chart - sprint 14 (available capacity: 10h per person Friday: 3h Monday: 3h Tuesday: 4h)</caption>
 +</figure>
 +</WRAP>
 +In this sprint, the planned work was developed during the sprint. All this information is present in image {{ref>figure-sprint-14}}.
 ==== - Sprint Evaluations ==== ==== - Sprint Evaluations ====
  