 In this sprint, the planned work was developed during the sprint. However, the team added a task on day three related to load and stress simulations. All this information is present in image {{ref>figure-sprint-13}}. In this sprint, the planned work was developed during the sprint. However, the team added a task on day three related to load and stress simulations. All this information is present in image {{ref>figure-sprint-13}}.
 +
 +
 +<WRAP round box>
 +<table table-sprint-14>
 +<caption>Sprint 14 - 12/05 to 18/06(velocity planned: 1w 1d 1h 20m and real velocity: 1w 6h 20m)</caption>
 +<WRAP center>
 +^ Product Backlog Item    ^ Assignee          ^ Planned Effort [h]     ^ Status ^ 
 +|Minute and week report |Tomás|0.5|Done|
 +|Refined list of materials|Pierre|5|Done|
 +|Finish the video|Pierre|8|Done|
 +|Finish the presentation|All|6|Done|
 +|Explanation of power budget and electrical diagram|Pierre|16|Done|
 +|Chapter 4|Aaro|6|Done|
 +|Chapter 7|Pierre and Waad|8|Done|
 +</WRAP>
 +</table>
 +</WRAP>
 +
 +<WRAP>
 +<figure figure-sprint-14>
 +{{ :burndown_chart_-_sprint_14.png?600 |}}
 +<caption>Burndown chart - sprint 14 (available capacity: 10h per person Friday: 3h Monday: 3h Tuesday: 4h)</caption>
 +</figure>
 +</WRAP>
 +In this sprint, the planned work was developed during the sprint. All this information is present in image {{ref>figure-sprint-14}}.