Description Link(s)
First drawings Link (initial idea); Link (initial idea)
First promotional Video
Black box System Diagrams Link
System Schematics Link
Project scope diagram Link
Gantt chart Link
Business Model Canvas Link
Interim Report Available at MS Teams
Refined Interim Report Available at MS Teams
Interim Presentation Link
Flyer Link (interim ver.) Link (final ver.)
Power budget Link
Electrical schematic Link
Leaflet Link
Research about the components Link
List of Materials & Components Link
3D Model Video ; ;
Drawings Link (initial idea); Link (final drawings)
Abstract Link
Packaging Link
Simulations Link
Final Report Available at MS Teams
Final Presentation Link to PDF format; Link to PPTX format (to present, it contains the playable video)
Paper Submitted to SCA 2025 (available at Overleaf)
Poster Link
Code Github repository
Manual Link
Video